Projects
Fire Safety Remediation, residential building, Dorset
Client-side project manager for fire safety remediation of an occupied 8-storey residential building, completed April 2023.
The scope of works for this 8-storey residential building included replacing composite balcony decking with AliDeck aluminium decking, installation of cavity barriers to voids in wrap-around balconies, curtainwall spandrel panel replacement, survey & repair of Knauf 'Warm Wall Rail' external wall system, and upgrading fire alarms to Part 6 LD1.
Residential development client
Cladding Remediation, residential apartment building, Hampshire
Client-side project manager for façade remediation of an occupied 10-storey residential building. Completed May 2024.
Managing a multi-disciplinary team including a specialist contractor, Fire Engineer, and Façade Engineer and commercial cladding consultant to carry out full strip and re-clad. Appointed in 2021 to manage EWS1 assessment, intrusive investigation, planning, procurement and management of the remediation works.
Residential development client
External Wall System Remediation, residential building
Client-side project manager for essential fire safety work to an occupied residential apartment building, completed September 2022.
The external remediation work included replacing PIR soffit insulation in the car park with Rockwool Soffit Slab, repairing intumescent paint to steelwork, replacing composite balcony decking with Alideck's non-combustible decking system and render remediation of the Wetherby Building Systems EWI system.
Residential development client
Mixed-use development, Poole
4-storey mixed-use development comprising 2 retail units (Costa Coffee and Post Office) and 36 retirement apartments. Asbestos removal prior to demolition. Ground remediation. Piled site, steel frame. Achieved BREAAM Very Good. Coordinated retail fit-out to achieve retail opening prior to occupation of apartments (to comply with Planning Consent).
Senior Development Manager, directly employed by McCarthy Stone
Fire Safety works and defect rectification, Southsea
Client-side project manager for fire safety works and defect rectification of an occupied 6-storey residential building. Commenced February 2024.
Replacement of combustible balcony and terrace decking with new AliDeck system. Investigation and rectification of latent defects.
Residential development client.
Decking Replacement
Like many residential building management companies, my client is gradually replacing combustible balcony decking with A1 non-combustible decking. To date we have completed decking replacement on two occupied apartment buildings using AliDeck Lite board V2, with more planned for the future.
Residential building management company client.
Retirement development, Bath
4-storey, 50 apartment development with resident's lounge, restaurant, and commercial kitchen facility.
First-time planning consent gained for this Conservation Area site (Bath World Heritage Site). EA Consultation, Flood Risk Assessment, and flood mitigation required due to location in Flood Zone 3 with live watercourse.
Senior Development Manager, directly employed by McCarthy Stone
MV Britannia, P&O Cruises
Major refit of spa and hotel public areas onboard Britannia, including re-design of the atrium and shops, upgrades to coffee bar, wine bar, and cabin refurbishment.
The onboard spa was transformed with new experiential entrance displays and new steam & ice thermal experiences.
Senior Refit Manager, directly employed by Carnival UK.
Radisson Blu, Edinburgh
Refurbishment of Radisson Blu hotel on the Royal Mile. Replacement of over 400 timber sash windows and the refurbishment of the hotel's key public areas including entrance and lounge. The refurbishment project was phased to enable completion in a live environment with minimal disruption to the hotel and its guests.
Senior Project Manager. Directly employed by CMC
Mandarin Oriental Hotel, London
Taking a Design Management role for the hotel's proposed full refurbishment of guestrooms, suites, restaurants, bars & spa facilities, I managed the consultant tender process and RIBA Design Stages 0-2. The early design work included coordinating with M&E consultants to plan major Building Services replacements and upgrades with a focus on sustainability and lowering carbon emissions.
Associate Director, employed by CMC
Hyatt Regency, Birmingham
Fast-track refurbishment of the Hyatt Regency Birmingham's spa and swimming pool areas following fire damage. Working in a Construction Management role I led the team to plan, design, and deliver a new sauna and a beautifully repaired and refurbished space to meet the Client's desired re-opening date ahead of a political party conference in Birmingham.
Senior Project & Cost Manager, directly employed by CMC
Park Inn Heathrow, Rezidor Hotel Group
External refurbishment project (windows, cladding & lighting), major Building Services replacements, and upgrades including HVAC & hot water services. Refurbishment of business wing guest bedrooms, reception, lounge, and bar.
Senior Project & Cost Manager, employed by CMC